A labeller can arrive with many boxes of tooling and still lack the parts needed for one planned bottle. Connect every supplied component to a named package format. The register should help the inspection team, seller and receiving operator describe the same physical equipment.
Describe the package, not only the bottle volume
Use a format code linked to the container drawing and label specification. Record application positions and orientation requirements. Two bottles with the same nominal volume may have different handling or decoration requirements, so keep them as separate entries until the supplied configuration has been checked.
Follow the container through the machine
Use the machine manual to identify relevant infeed, transfer, bottle-support and discharge parts. Request photographs of markings, quantities and condition. Ask which parts are installed and which are supplied loose. Keep unidentified items in their own list until the seller can establish their purpose.
| Part of the register | Evidence to retain |
|---|---|
| Container handling | Photographed components linked to a drawing |
| Application group | Fitted station identity and label specification |
| Controls and recipes | Available backup and format-setting records |
| Loose accessories | Quantity, marking, condition and packing reference |
Link the fitted stations to the format list
Krones documents different labelling technologies and modular configurations. For a used machine, ask which stations are physically fitted and which additional groups are included. Treat a station mentioned in a brochure, but absent from the supply list, as an open quotation question.
Record a complete format change
When a trial is available, document parts removed, settings changed and the first acceptable labelled samples after restart. Include coding and inspection adjustments where those systems are present. Ask the operator to identify tasks that rely on experience rather than recorded settings so the receiving team can plan training.
Make the delivery check possible
Give every box or tooling set a packing reference and link it to the register. Retain photographs before loading. Record any missing parts with a proposed source and review step. The final handover should distinguish a physically complete delivery from a format that still needs engineering work or testing.
Buying checklist
- Format codes linked to bottle and label drawings
- Marked handling parts with quantities
- Installed and loose application groups
- Available recipes, backups and documentation
- Recorded changeover and labelled samples
- Packing references and unresolved tooling list